Estimating teams are under new pressure: align cost and carbon, fast. As frameworks demand integrated outputs, the old silos are becoming liabilities. This article unpacks the risks of parallel estimating, and the gains of getting ahead.
Year: 2025
Three Simple Fixes to Streamline Bid Prep
Bid preparation should be strategic, not a scramble. Too often, teams are stuck fixing errors instead of building winning submissions. In this article, we unpack three simple but high-impact fixes: connect your spreadsheets to a single source of truth, estimate carbon and cost together from the start, and standardise outputs to speed up every sign-off. Small changes. Big results. Better bids, faster.
How Carbon-Integrated Cost Estimating Gives You a Competitive Edge
Cost certainty isn’t enough. Today’s bids demand carbon accountability too. This guide explores how carbon-integrated cost estimating gives your team a measurable edge — cutting risk, saving time, and producing outputs that stand up to audit and win work.
Still Estimating in Excel? There’s a Smarter Way
Want to align with PAS 2080 without slowing your preconstruction workflows down? This article has practical tips to support you and your team.
How to Align with PAS 2080 in Preconstruction (Without Slowing Down)
Want to align with PAS 2080 without slowing your preconstruction workflows down? This article has practical tips to support you and your team.
Meet Sterling at London Climate Action Week 2025
The climate conversation isn’t new. But what’s changing — and quickly — is the level of expectation. From procurement frameworks..
April 2025
Sterling Product Update April 2025 We’re excited to introduce a series of enhancements aimed at streamlining your workflow and enhancing..
D2 and Sterling DCS Partner to Advance Sustainable Programme Management in Infrastructure Projects
Driving Innovation and Sustainability in Infrastructure Delivery Through Data-Driven Programme Management London, UK – 4th March 2025 – D2, a..